ATTENTION: ALL MYWDT USERS
The MyWDT Portal is experiencing sporadic network outages. We apologize for the disruption and we are working to resolve the issue.
Shielded Metal Arc Welding II (WDM 150)
Term: 2019-2020 Spring
Wed, 8:00 AM - 12:10 PM (1/13/2020 - 5/15/2020) Location: MAIN L 127
Shielded Metal Arc Welding classroom theory and skills training in the lab enables the student to attain an acceptable level of welding skills. Students will weld on grooved plate with backing and open root, in and out of position. These welds will be completed on 3/8” – 1” thickness metal using E7018 and E6010 electrodes. PREREQUISITE: WDM 102.